• Panjab Flooring Team
In commercial fast-track construction, waiting weeks for subfloor concrete to dry is not an option. Experienced commercial flooring contractors in Oxfordshire utilize rapid-setting screeds and surface damp-proof membranes (DPM).
Fast-Track Subfloor Engineering
- Epoxy & Liquid Surface DPM: Seals high-moisture concrete slabs (up to 98% RH), allowing floor fitting within 24 hours.
- Rapid-Drying Self-Levelling Compounds: Walkable within 2 hours and ready for vinyl/LVT overlay in 4 to 6 hours.
- Heavy-Duty Latex Screeds: Engineered for high mechanical load stability under commercial traffic.
Panjab Flooring delivers expert subfloor engineering for commercial sites across Oxfordshire.
